Opening soon!

The new farm stand, still under construction, should be open around June. It’s built mainly of rough-cut cedar from a local independent sawmill, with some old fence boards recycled as flooring.
Possibly similar posts:

The new farm stand, still under construction, should be open around June. It’s built mainly of rough-cut cedar from a local independent sawmill, with some old fence boards recycled as flooring.

This spring-fed pond was dug out last year from what was only a slightly soggy low end of the field. It holds around 30-40,000 gallons of water for not so rainy days. The barrel acts as a float, holding in position, suspended above the muck on the bottom, a plastic intake pipe that leads to the pump.